{"id":23388,"date":"2012-06-19T09:12:19","date_gmt":"2012-06-19T09:12:19","guid":{"rendered":"https:\/\/pancanal.com\/en\/?p=23388"},"modified":"2021-09-10T09:12:37","modified_gmt":"2021-09-10T09:12:37","slug":"panama-canal-completes-first-monolith-at-the-new-pacific-locks","status":"publish","type":"post","link":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/","title":{"rendered":"Panama Canal Completes First Monolith at the New Pacific Locks"},"content":{"rendered":"<p><a title=\"\" href=\"https:\/\/www.pancanal.com\/eng\/pr\/press-releases\/images\/446-01-lge.jpg\" rel=\"lightbox\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\"><img decoding=\"async\" class=\"border\" src=\"https:\/\/www.pancanal.com\/eng\/pr\/press-releases\/images\/446-01-sm.jpg\" alt=\"\" align=\"right\" \/><\/a><strong>Panama, June 19, 2012 &#8211;<\/strong>\u00a0A new milestone was reached at the Panama Canal, after completing the construction of the first monolith for the new locks on the Pacific end of the Panama Canal. This monolith is the first one to be completed from a total of 46 such structures being built in the Pacific locks upper chamber. The term monolith refers to each of the sections in which the lock walls are being divided to facilitate their construction.<\/p>\n<p>The massive concrete and steel structure is 33.84 meters high, 7.5 meters wide and 27 meters deep and is located in the upper chamber&#8217;s east side. The enormous culverts are part of the locks filling and emptying system and will run along the lock walls, made up of these monoliths. To give an idea of their dimensions, the main culvert alone is 8.3 meters wide by 6.5 meters high, big enough to enable the simultaneous passage of two railroads. The lock walls will also contain the auxiliary culverts measuring 6.5 meters wide by 6.5 meters high.<\/p>\n<p>The construction of this monolith required 232 tons of reinforced steel and 2,605 cubic meters of concrete.<\/p>\n<p><a title=\"\" href=\"https:\/\/www.pancanal.com\/eng\/pr\/press-releases\/images\/446-02-lge.jpg\" rel=\"lightbox\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\"><img decoding=\"async\" class=\"border alignleft\" src=\"https:\/\/www.pancanal.com\/eng\/pr\/press-releases\/images\/446-02-sm.jpg\" alt=\"\" align=\"left\" \/><\/a>&#8220;As we reach another milestone, we at the Panama Canal are proud to acknowledge that this new third lane will be a game changer in world maritime commerce,&#8221; said Panama Canal Authority Administrator\/ CEO Alberto Alem\u00e1n Zubieta.<\/p>\n<p>Expansion will build a new lane of traffic along the Panama Canal through the construction of a new set of locks, which will double tonnage capacity and allow the transit of much longer, wider ships through the waterway.<\/p>\n<p><strong>About the Panama Canal Authority (ACP)<br \/>\n<\/strong>The ACP is the autonomous agency of the Government of Panama in charge of managing, operating and maintaining the Panama Canal. The operation of the ACP is based on its organic law and the regulations approved by its Board of Directors. For more information, please refer to the ACP&#8217;s Web site: www.pancanal.com. For Panama Canal video, please visit\u00a0<a href=\"http:\/\/www.youtube.com\/elcanaldepanamatv\" data-rel=\"lightbox-video-0\">http:\/\/www.youtube.com\/elcanaldepanamatv<\/a>. You can also follow us on Twitter:\u00a0<a href=\"http:\/\/twitter.com\/thepanamacanal\">http:\/\/twitter.com\/thepanamacanal<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Panama, June 19, 2012 &#8211;\u00a0A new milestone was reached at the Panama Canal, after completing the construction of the first monolith for the new locks on the Pacific end of the Panama Canal. This monolith is the first one to be completed from a total of 46 such structures being built in the Pacific locks &hellip; <a href=\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Panama Canal Completes First Monolith at the New Pacific Locks&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[1],"tags":[50],"class_list":["post-23388","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-image"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Panama Canal Completes First Monolith at the New Pacific Locks - Autoridad del Canal de Panam\u00e1<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Panama Canal Completes First Monolith at the New Pacific Locks - Autoridad del Canal de Panam\u00e1\" \/>\n<meta property=\"og:description\" content=\"Panama, June 19, 2012 &#8211;\u00a0A new milestone was reached at the Panama Canal, after completing the construction of the first monolith for the new locks on the Pacific end of the Panama Canal. This monolith is the first one to be completed from a total of 46 such structures being built in the Pacific locks &hellip; Continue reading &quot;Panama Canal Completes First Monolith at the New Pacific Locks&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\" \/>\n<meta property=\"og:site_name\" content=\"Autoridad del Canal de Panam\u00e1\" \/>\n<meta property=\"article:published_time\" content=\"2012-06-19T09:12:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-10T09:12:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pancanal.com\/eng\/pr\/press-releases\/images\/446-01-sm.jpg\" \/>\n<meta name=\"author\" content=\"cdp_admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cdp_admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\"},\"author\":{\"name\":\"cdp_admin\",\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/person\/86556a67317d8d0d22145ec375d2aa59\"},\"headline\":\"Panama Canal Completes First Monolith at the New Pacific Locks\",\"datePublished\":\"2012-06-19T09:12:19+00:00\",\"dateModified\":\"2021-09-10T09:12:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\"},\"wordCount\":348,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/pancanal.com\/en\/#organization\"},\"keywords\":[\"Image\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\",\"url\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\",\"name\":\"Panama Canal Completes First Monolith at the New Pacific Locks - Autoridad del Canal de Panam\u00e1\",\"isPartOf\":{\"@id\":\"https:\/\/pancanal.com\/en\/#website\"},\"datePublished\":\"2012-06-19T09:12:19+00:00\",\"dateModified\":\"2021-09-10T09:12:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\/\/pancanal.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Panama Canal Completes First Monolith at the New Pacific Locks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pancanal.com\/en\/#website\",\"url\":\"https:\/\/pancanal.com\/en\/\",\"name\":\"Autoridad del Canal de Panam\u00e1\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/pancanal.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pancanal.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pancanal.com\/en\/#organization\",\"name\":\"Canal de Panam\u00e1\",\"url\":\"https:\/\/pancanal.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png\",\"contentUrl\":\"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png\",\"width\":588,\"height\":124,\"caption\":\"Canal de Panam\u00e1\"},\"image\":{\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/person\/86556a67317d8d0d22145ec375d2aa59\",\"name\":\"cdp_admin\",\"sameAs\":[\"https:\/\/pancanal.com\"],\"url\":\"https:\/\/pancanal.com\/en\/author\/cdp_admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Panama Canal Completes First Monolith at the New Pacific Locks - Autoridad del Canal de Panam\u00e1","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/","og_locale":"en_US","og_type":"article","og_title":"Panama Canal Completes First Monolith at the New Pacific Locks - Autoridad del Canal de Panam\u00e1","og_description":"Panama, June 19, 2012 &#8211;\u00a0A new milestone was reached at the Panama Canal, after completing the construction of the first monolith for the new locks on the Pacific end of the Panama Canal. This monolith is the first one to be completed from a total of 46 such structures being built in the Pacific locks &hellip; Continue reading \"Panama Canal Completes First Monolith at the New Pacific Locks\"","og_url":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/","og_site_name":"Autoridad del Canal de Panam\u00e1","article_published_time":"2012-06-19T09:12:19+00:00","article_modified_time":"2021-09-10T09:12:37+00:00","og_image":[{"url":"https:\/\/www.pancanal.com\/eng\/pr\/press-releases\/images\/446-01-sm.jpg"}],"author":"cdp_admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cdp_admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#article","isPartOf":{"@id":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/"},"author":{"name":"cdp_admin","@id":"https:\/\/pancanal.com\/en\/#\/schema\/person\/86556a67317d8d0d22145ec375d2aa59"},"headline":"Panama Canal Completes First Monolith at the New Pacific Locks","datePublished":"2012-06-19T09:12:19+00:00","dateModified":"2021-09-10T09:12:37+00:00","mainEntityOfPage":{"@id":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/"},"wordCount":348,"commentCount":0,"publisher":{"@id":"https:\/\/pancanal.com\/en\/#organization"},"keywords":["Image"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/","url":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/","name":"Panama Canal Completes First Monolith at the New Pacific Locks - Autoridad del Canal de Panam\u00e1","isPartOf":{"@id":"https:\/\/pancanal.com\/en\/#website"},"datePublished":"2012-06-19T09:12:19+00:00","dateModified":"2021-09-10T09:12:37+00:00","breadcrumb":{"@id":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pancanal.com\/en\/panama-canal-completes-first-monolith-at-the-new-pacific-locks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/pancanal.com\/en\/"},{"@type":"ListItem","position":2,"name":"Panama Canal Completes First Monolith at the New Pacific Locks"}]},{"@type":"WebSite","@id":"https:\/\/pancanal.com\/en\/#website","url":"https:\/\/pancanal.com\/en\/","name":"Autoridad del Canal de Panam\u00e1","description":"","publisher":{"@id":"https:\/\/pancanal.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pancanal.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pancanal.com\/en\/#organization","name":"Canal de Panam\u00e1","url":"https:\/\/pancanal.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png","contentUrl":"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png","width":588,"height":124,"caption":"Canal de Panam\u00e1"},"image":{"@id":"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/pancanal.com\/en\/#\/schema\/person\/86556a67317d8d0d22145ec375d2aa59","name":"cdp_admin","sameAs":["https:\/\/pancanal.com"],"url":"https:\/\/pancanal.com\/en\/author\/cdp_admin\/"}]}},"_links":{"self":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/posts\/23388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/comments?post=23388"}],"version-history":[{"count":0,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/posts\/23388\/revisions"}],"wp:attachment":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/media?parent=23388"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/categories?post=23388"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/tags?post=23388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}