{"id":50718,"date":"2025-05-30T10:46:17","date_gmt":"2025-05-30T15:46:17","guid":{"rendered":"https:\/\/pancanal.com\/?p=50718"},"modified":"2025-06-02T13:21:41","modified_gmt":"2025-06-02T18:21:41","slug":"panama-canal-undertook-maintenance-work-at-pedro-miguel-locks","status":"publish","type":"post","link":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/","title":{"rendered":"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks"},"content":{"rendered":"<p>The Panama Canal undertook scheduled maintenance work in one of the chambers of the Pedro Miguel Locks, as part of its ongoing asset and infrastructure maintenance program.<\/p>\n<p>The work, referred to as a \u201cdry chamber\u201d because it required draining the lock\u2019s chamber, began on Tuesday, May 27, and was completed on Saturday, May 31. According to the schedule, while the west lane was under reconditioning, the east lane remained operational, ensuring uninterrupted vessel traffic.<\/p>\n<p>The maintenance was both preventive and corrective in nature. It included the replacement of apex seals and the lower omega-type seal, repairs to hinges due to wear on the wall and gate plates (concave and convex), inspection of the ball joint, and adjustments to the gate system\u2019s upper anchorage, known as the \u201cyoke.\u201d<\/p>\n<p>This extensive maintenance effort mobilized 300 team members working in two shifts: 150 during the day and 150 at night. Planning for the project took six months, underscoring the precision required to successfully complete the work within just five days.<\/p>\n<p>\u201cThis is a Canal with more than 110 years of history, and as part of our commitment to safe and efficient operations, we carried out essential preventive maintenance on the Panamax locks,\u201d said Boris Moreno, Vice President for Panama Canal Operations. \u201cThis work took on even greater significance as we commemorated the Canal&#8217;s 25th anniversary under Panamanian administration, reflecting our continued responsibility to the country and global trade.\u201d<\/p>\n<p>Miguel Lorenzo, Vice President for Infrastructure and Engineering, emphasized that \u201cmaintenance is part of our culture and a pillar of our competitiveness. For this reason, the Canal invests more than B\/. 500 million annually in the maintenance of its infrastructure assets, equipment, fleets, and facilities.\u201d<\/p>\n<p>The Canal\u2019s comprehensive maintenance program also includes regular interventions in the Neopanamax locks, the dams and spillways of Gatun, Madden, and Miraflores, transmission and power generation systems, civil infrastructure such as the Atlantic Bridge, and floating, land-based, and navigation channel equipment.<\/p>\n<p>Through these actions and a robust investment in maintenance, the Panama Canal guarantees operational continuity, service excellence, and the long-term sustainability of its operations.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-50672\" src=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS-1024x683.jpg\" alt=\"\" width=\"840\" height=\"560\" srcset=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS-1024x683.jpg 1024w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS-300x200.jpg 300w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS-768x512.jpg 768w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS.jpg 1280w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-50670\" src=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_154705450_iOS-1024x683.jpg\" alt=\"\" width=\"840\" height=\"560\" srcset=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_154705450_iOS-1024x683.jpg 1024w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_154705450_iOS-300x200.jpg 300w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_154705450_iOS-768x512.jpg 768w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_154705450_iOS.jpg 1280w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-50668\" src=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_160535620_iOS-1024x683.jpg\" alt=\"\" width=\"840\" height=\"560\" srcset=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_160535620_iOS-1024x683.jpg 1024w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_160535620_iOS-300x200.jpg 300w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_160535620_iOS-768x512.jpg 768w, https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_160535620_iOS.jpg 1280w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Panama Canal undertook scheduled maintenance work in one of the chambers of the Pedro Miguel Locks, as part of its ongoing asset and infrastructure maintenance program. The work, referred to as a \u201cdry chamber\u201d because it required draining the lock\u2019s chamber, began on Tuesday, May 27, and was completed on Saturday, May 31. According &hellip; <a href=\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Panama Canal Undertook Maintenance Work at Pedro Miguel Locks&#8221;<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":50672,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[124],"tags":[],"class_list":["post-50718","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Panama Canal Undertook Maintenance Work at Pedro Miguel Locks - Autoridad del Canal de Panam\u00e1<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks - Autoridad del Canal de Panam\u00e1\" \/>\n<meta property=\"og:description\" content=\"The Panama Canal undertook scheduled maintenance work in one of the chambers of the Pedro Miguel Locks, as part of its ongoing asset and infrastructure maintenance program. The work, referred to as a \u201cdry chamber\u201d because it required draining the lock\u2019s chamber, began on Tuesday, May 27, and was completed on Saturday, May 31. According &hellip; Continue reading &quot;Panama Canal Undertook Maintenance Work at Pedro Miguel Locks&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\" \/>\n<meta property=\"og:site_name\" content=\"Autoridad del Canal de Panam\u00e1\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-30T15:46:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-02T18:21:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"854\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Roberto Rodr\u00edguez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Roberto Rodr\u00edguez\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\"},\"author\":{\"name\":\"Roberto Rodr\u00edguez\",\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/person\/75222fb1e45f0ebd21d1251b752beb0a\"},\"headline\":\"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks\",\"datePublished\":\"2025-05-30T15:46:17+00:00\",\"dateModified\":\"2025-06-02T18:21:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\"},\"wordCount\":350,\"publisher\":{\"@id\":\"https:\/\/pancanal.com\/en\/#organization\"},\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\",\"url\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\",\"name\":\"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks - Autoridad del Canal de Panam\u00e1\",\"isPartOf\":{\"@id\":\"https:\/\/pancanal.com\/en\/#website\"},\"datePublished\":\"2025-05-30T15:46:17+00:00\",\"dateModified\":\"2025-06-02T18:21:41+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\/\/pancanal.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pancanal.com\/en\/#website\",\"url\":\"https:\/\/pancanal.com\/en\/\",\"name\":\"Autoridad del Canal de Panam\u00e1\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/pancanal.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pancanal.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pancanal.com\/en\/#organization\",\"name\":\"Canal de Panam\u00e1\",\"url\":\"https:\/\/pancanal.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png\",\"contentUrl\":\"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png\",\"width\":588,\"height\":124,\"caption\":\"Canal de Panam\u00e1\"},\"image\":{\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/pancanal.com\/en\/#\/schema\/person\/75222fb1e45f0ebd21d1251b752beb0a\",\"name\":\"Roberto Rodr\u00edguez\",\"url\":\"https:\/\/pancanal.com\/en\/author\/rorrodriguezpancanal-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks - Autoridad del Canal de Panam\u00e1","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/","og_locale":"en_US","og_type":"article","og_title":"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks - Autoridad del Canal de Panam\u00e1","og_description":"The Panama Canal undertook scheduled maintenance work in one of the chambers of the Pedro Miguel Locks, as part of its ongoing asset and infrastructure maintenance program. The work, referred to as a \u201cdry chamber\u201d because it required draining the lock\u2019s chamber, began on Tuesday, May 27, and was completed on Saturday, May 31. According &hellip; Continue reading \"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks\"","og_url":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/","og_site_name":"Autoridad del Canal de Panam\u00e1","article_published_time":"2025-05-30T15:46:17+00:00","article_modified_time":"2025-06-02T18:21:41+00:00","og_image":[{"width":1280,"height":854,"url":"https:\/\/pancanal.com\/wp-content\/uploads\/2025\/05\/20250529_165308660_iOS.jpg","type":"image\/jpeg"}],"author":"Roberto Rodr\u00edguez","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Roberto Rodr\u00edguez","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/#article","isPartOf":{"@id":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/"},"author":{"name":"Roberto Rodr\u00edguez","@id":"https:\/\/pancanal.com\/en\/#\/schema\/person\/75222fb1e45f0ebd21d1251b752beb0a"},"headline":"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks","datePublished":"2025-05-30T15:46:17+00:00","dateModified":"2025-06-02T18:21:41+00:00","mainEntityOfPage":{"@id":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/"},"wordCount":350,"publisher":{"@id":"https:\/\/pancanal.com\/en\/#organization"},"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/","url":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/","name":"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks - Autoridad del Canal de Panam\u00e1","isPartOf":{"@id":"https:\/\/pancanal.com\/en\/#website"},"datePublished":"2025-05-30T15:46:17+00:00","dateModified":"2025-06-02T18:21:41+00:00","breadcrumb":{"@id":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pancanal.com\/en\/panama-canal-undertook-maintenance-work-at-pedro-miguel-locks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/pancanal.com\/en\/"},{"@type":"ListItem","position":2,"name":"Panama Canal Undertook Maintenance Work at Pedro Miguel Locks"}]},{"@type":"WebSite","@id":"https:\/\/pancanal.com\/en\/#website","url":"https:\/\/pancanal.com\/en\/","name":"Autoridad del Canal de Panam\u00e1","description":"","publisher":{"@id":"https:\/\/pancanal.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pancanal.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pancanal.com\/en\/#organization","name":"Canal de Panam\u00e1","url":"https:\/\/pancanal.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png","contentUrl":"https:\/\/pancanal.wpengine.com\/wp-content\/uploads\/2021\/07\/p-logo.png","width":588,"height":124,"caption":"Canal de Panam\u00e1"},"image":{"@id":"https:\/\/pancanal.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/pancanal.com\/en\/#\/schema\/person\/75222fb1e45f0ebd21d1251b752beb0a","name":"Roberto Rodr\u00edguez","url":"https:\/\/pancanal.com\/en\/author\/rorrodriguezpancanal-com\/"}]}},"_links":{"self":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/posts\/50718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/comments?post=50718"}],"version-history":[{"count":0,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/posts\/50718\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/media\/50672"}],"wp:attachment":[{"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/media?parent=50718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/categories?post=50718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pancanal.com\/en\/wp-json\/wp\/v2\/tags?post=50718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}